Civil Engineering stories
Construction teams can now spot clashes earlier and plan safer installations as PERI UK adds BIM, 3D visualisation and XR tools to temporary works.
The compact topless crane targets crowded city sites, with touchscreen controls meant to speed commissioning, maintenance and reduce downtime.
Researchers can now test whether frontier models can produce safe, code-compliant engineering designs, after Google released an open benchmark with 29 public tasks.
Its museum redevelopment work earned March Construction the region's top contractor title, alongside a separate win for projects worth over $10 million.
Grayson Engineering and other winners were honoured after more than 50 entries, with judges praising the sector's rising standards.
Residents will see three kilometres of river defences lifted and strengthened, after Gabrielle exposed Waipawa's vulnerability to flooding.
The Tauriko enabling works near Tauranga finished ahead of schedule and 8 per cent under budget, earning Downer the Supreme Award.
The project is set to power about 36,000 homes a year, adding one of New Zealand's largest solar assets to Christchurch's grid.
Visitors to Wellington's waterfront will see brighter paths and programmable event lighting after McKay finished the Te Papa and Taranaki upgrade by 7 March.
Weather remains the main risk to Ashburton's second bridge, but NZTA says the NZD $134-$144 million project is still on time and on budget.
His regional victory sends Marcus Ingram to the national finals after he beat eight other operators in Hastings.
Flood damage has left the reserve closed for months, with repairs estimated at $35,000 and new toilets costing $148,000 before campers can return.
Vegetation clearance has started as Cobden's floodbank is raised to better protect homes from a one-in-150-year flood, at a cost of $410,000.
More than 50 layouts have been tested as technical constraints reshape Somerset Developments' plan for eight acreage homesites on a 17-acre Rosemount site.
The Thompson Engineering drainlayer will now represent the region at the national finals after edging 15 experienced rivals and a novice field.
Work high above the Yangtze is pushing the Shituo crossing towards four engineering records as it nears an end-2026 opening.
As Cyclone Gabrielle recovery winds down, local contractors are trimming jobs and councils warn the region's civil work pipeline is shrinking.
The withdrawal threatens to complicate a key flood-protection project for Te Karaka, which was overwhelmed in Cyclone Gabrielle and saw hundreds evacuated.
Road users and freight operators should benefit from a safer, more reliable link, as the project is now forecast at $275-$325m after savings on tender pricing and design.
Rising infrastructure work in Queensland has prompted the consultancy to expand its Brisbane team to more than 24 staff since 2021.